Project Ridge Vault

PHASE 1 ACTIVE DEVELOPMENT

Project Ridge Vault

Big Horn Basin Entry Project

PHASE 1 — ACTIVE DEVELOPMENT

Tensleep Sandstone Development

640 Acres Big Horn County Wyoming

Project Ridge Vault is AIO Oil's initial development project — a 640-acre state mineral position in Big Horn County, Wyoming, targeting the Tensleep Sandstone formation.

The project represents the company's entry into active operations and establishes the foundation for broader Wyoming development. Initial activity emphasizes disciplined execution, diagnostic-quality data acquisition, and long-term portfolio growth.

640

Acres

2

Target Formations

1

Active Development Project

PROJECT DETAILS

Project Specifications

Location
T56N R97W, Sections 8/9/16/17
County
Big Horn County
Primary Target
Tensleep Sandstone
Secondary Target
Phosphoria / Embar
Acreage
640 Acres
Adjacent Fields
Byron & Garland
TECHNICAL FOUNDATION

Documented Geological Evidence

The Tensleep Sandstone at the Project Ridge Vault location has documented productive characteristics supported by multiple independent lines of primary-source evidence.

Technical Foundation
6
Independent Technical Evidence Sources
✓ Historical Wells Multiple historical wells on or adjacent to the parcel documenting the geological framework.
✓ Core Analysis Reservoir quality measurements from on-parcel core analysis.
✓ Oil-Water Contact Documented oil-water contact based on six independent measurements.
✓ Virgin Reservoir Pressure Confirmed through historical drill stem testing.
✓ Garland Field Analogs Adjacent field production analogs from currently producing Garland Field.
✓ Section 15 Production Direct virgin recovery analog from historical Section 15 Tensleep production.
EXECUTION ROADMAP

Phase 1 Development Plan

Phase 1 development consists of an initial drilling program targeting the Tensleep Sandstone at structurally favorable positions across the Project Ridge Vault acreage.

01

Phase 1 Wells

2 Producing Wells + 1 Saltwater Disposal Well

02

SWD Approach

Abandoned Well Conversion (Capital Efficient Strategy)

03

Total Depth

Approximately 6,400 ft TVD

04

Logging Suite

Modern Triple Combo with Comprehensive Data Acquisition

05

Operating Partner

Experienced Big Horn Basin Operating Partner

06

Pre-Drilling Work

Seismic Licensing Evaluation Currently Underway

CONFIDENTIAL INFORMATION

Additional Technical Data Available Upon Request

Detailed geological evaluations, reservoir studies, economic projections, engineering reports, development planning documents, and supporting technical materials related to Project Ridge Vault are available to qualified parties under appropriate confidentiality arrangements.

Request Additional Information